The Financial Express · 1d
Mumbai-Ahmedabad Bullet Train Project Advances: Foundation work for eight stations in Gujarat now complete
As of now, 350 kilometers of pier foundations, 316 kilometers of pier constructions, 221 kilometers of girder casting, and 190 kilometers of girder launching have been completed.
Swarajya · 3h
Bengaluru To Manufacture India's First High-Speed Train, Designed For 280 Kmph For The Mumbai-Ahmedabad Corridor
Bengaluru, known for its technological advancements, is poised to make history by manufacturing India’s first high-speed train. On 5 September 2024, the Integral Coach Factory (ICF) issued a tender to build two state-of-the-art high-speed chair-car trains, designed to reach a top speed of 280 km/h and operate at 250 km/h.
Swarajya · 8d
Mumbai-Ahmedabad Bullet Train Corridor Fitted With 175,000 Advanced Noise Barriers So Far
Internally, the bullet train’s double-skin aluminium alloy body minimises noise levels for passengers. Additionally, its streamlined nose design significantly reduces aerodynamic drag, thereby mitigating the loud sounds produced by micro-pressure waves as the train exits tunnels.
Some results have been hidden because they may be inaccessible to you
Show inaccessible results